French industrial expertise · Since 1994

Capturing vapours at gluing and cleaning stations

Gluing, degreasing, cleaning: capture solvent vapours at source and discharge them outside the workshop.

CAPTAIR capture equipment or design study

01 / Gluing and solvents

Vapours released without velocity

Solvent vapour rises from a tank, a tray or a freshly glued part with no velocity of its own. For this case the INRS uses 0.25 to 0.5 m/s at the emission point (ED 695, table III): a low airflow is enough, provided the hood is very close.

The safety data sheet gives the compounds, their limit values and their flammability: it is the first document in the file.

02 / Gluing and solvents

The right hood for each workstation

Tray or tank: slot hood on the rim or a Pouyès ring around the opening, which capture the vapour at its level. Gluing station: downdraft table or backdraft hood. Large parts: open-front booth, calculated on the area of its opening.

Avoid canopy hoods above the operator: they draw the vapours through the breathing zone.

03 / Gluing and solvents

Extract and discharge

The extracted air is discharged outside the building by ductwork and a fan sized for the product, with a discharge point away from fresh-air intakes.

With flammable solvents, the fan and the ductwork are built in ATEX execution according to your zoning.

Useful answers

Frequently asked questions

Does a dust filter retain solvent vapours?

No. A particle filter does not retain a gas: vapours are captured and discharged outdoors.

Is an ATEX fan required?

Yes if your zoning classifies the inside of the ductwork as an explosive zone, which is common with flammable solvents. The ATEX fan is then built from non-sparking materials.

Your industrial project

Tell us what you need.

Send us photos of the workstations, the materials worked, which workstations run at the same time and your working hours: we size the capture and filtration and send you a costed quote.

Contact us

Let’s talk about your installation.

A technician from our engineering office studies your needs and proposes the right solution for your workshop: machine, capture, ductwork and filtration.

Reply within 48 working hours.

Your request, step by step

  1. 1

    You describe your needs

    Pollutant, workstations, constraints: a few lines are enough. A photo of the installation helps us a lot.

  2. 2

    Our engineering office studies it

    Capture, airflow, ductwork and filtration are sized for your site, together with you if anything needs clarifying.

  3. 3

    You receive a written proposal

    Machine, options and price, in detail: you decide with full knowledge of the facts.

  • Since 1994in industrial air treatment
  • In-house engineering officefrom design to supply
  • All brandsfilters and spare parts
  • French Fabnetwork member
Call Contact us