French industrial expertise · Since 1994
Air extraction and ventilation for industrial workshops
Air extraction and ventilation of industrial workshops: capture at source, general ventilation, fresh-air supply and the airflows set by the French Labour Code.

01 / Workshop ventilation
Capture at source first
The French Labour Code requires pollutants to be captured as close as possible to their emission point, before they spread through the workshop.
General ventilation complements this capture, it does not replace it: dust, fumes and vapours emitted at a workstation are captured at that workstation.
02 / Workshop ventilation
General ventilation: renewing the air
It removes heat, humidity and diffuse pollutants, through extractors or roof fans.
In rooms without specific pollution, the French Labour Code sets a minimum of fresh air per occupant: 45 m³/h for light physical work, 60 m³/h in other workshops.
03 / Workshop ventilation
Making up the extracted air
All the air extracted must be replaced by fresh air, heated in winter if possible.
Without make-up air, the room goes into negative pressure: the hoods lose efficiency and draughts disturb the operators.
04 / Workshop ventilation
Preparing your project
The workshop layout with the ceiling height, the list of emitting workstations and pollutants, the headcount, the heat sources, and the possible locations of the extractors and air inlets.
From this data, our engineering office sizes the capture, the ductwork, the fans and the air supply.
Useful answers
Frequently asked questions
What is the difference between capture and general ventilation?
Capture extracts the pollutant at the workstation, before it reaches the operator. General ventilation renews the air of the whole room and dilutes what remains.
What fresh-air rate in a workshop?
For a room without specific pollution: at least 45 m³/h per occupant for light physical work and 60 m³/h in other cases (French Labour Code). A room with specific pollution is sized from its pollutants.
Can the air extracted from a workshop be recirculated?
Only if it is effectively cleaned, depending on the nature of the pollutant and the regulations. Recirculation is studied case by case.
Continue your selection
Related solutions and guides
Your industrial project
Tell us what you need.
Send us your workshop layout, the list of workstations and pollutants and the headcount: our engineering office sizes the installation and sends you a quote.
Contact us
Let’s talk about your installation.
A technician from our engineering office studies your needs and proposes the right solution for your workshop: machine, capture, ductwork and filtration.
Reply within 48 working hours.
Your request, step by step
-
1
You describe your needs
Pollutant, workstations, constraints: a few lines are enough. A photo of the installation helps us a lot.
-
2
Our engineering office studies it
Capture, airflow, ductwork and filtration are sized for your site, together with you if anything needs clarifying.
-
3
You receive a written proposal
Machine, options and price, in detail: you decide with full knowledge of the facts.
- Since 1994in industrial air treatment
- In-house engineering officefrom design to supply
- All brandsfilters and spare parts
- French Fabnetwork member
